Concrete Service
Concrete Foundations
Structural foundations engineered for desert soil.
Overview
Foundations are the one place you cannot cut corners. We build to the engineer's stamped plans, pass first-time inspections, and deliver as-builts so your framer starts on the promised Monday.
What's included
- Monolithic and stem-wall foundations
- Post-tensioned slabs for expansive soils
- 10-mil vapor barrier over compacted base
- Termite pre-treatment coordination
- Anchor bolts and hold-downs set to plan
- Engineer-signed as-builts on request
Our process
- 1
Review the plans
We take off quantities from your engineer's drawings and price to spec.
- 2
Excavate & form
Dig footings, set forms and vapor barrier, place rebar or PT cables.
- 3
Pre-pour inspection
We meet the inspector on-site and address any callouts before the truck arrives.
- 4
Pour & cure
Monolithic pour, screed to elevation, then a controlled moist cure.
Frequently asked
- Do you work with my engineer?
- Absolutely — send us the stamped plans and we build exactly to them.
- How long before framing can start?
- Typically 5–7 days after the pour, depending on temperatures and the engineer's requirement.